Pulverized Coal Boiler


Product introduction

New type high efficiency and energy-saving environmental protection industrial pulverized coal boiler system is a kind of pulverized coal combustion as the core,By the coal reserves, accept, conveying, ignition, combustion and heat transfer, the boiler flue gas purification, automatic control technology sets consisting of new boiler technology system.The main equipment of the new type of efficient pulverized coal fired industrial boiler system including:Pulverized coal bin, rotary discharge valve, the middle bin, screw feeder, a fan, a two fan, pulverized coal burner, boiler host, economizer, dust collector, a draught fan, desulfurization unit, chimney, blowing dust device and automatic control system etc.

Technical characteristics

  • 1.Energy saving and high efficiency coal burnout rate reached more than 98%,The boiler thermal efficiency of more than 88%,Boiler with auxiliary gas ignition,The operation can start, fuel saving;Compared with the traditional coal-fired boiler, saving more than 30%;
  • 2.Environmental protection cleaning by high desulfurization and dust bag,Dust ≤ 30mg/Nm3,SO2≤100mg/Nm3、NOx ≤200mg/Nm3,Below the national emission standard,To meet the strict requirements of environmental protection;Concentrated powder, concentrated distribution, centralized collection of ash, sealed operation, truly clean combustion;
  • 3.Simple operationequipped withmodern automatic control technology,Boiler, coal, combustion, desulfurization dust, slag and other automation control,The fireman less, good working environment;
  • 4.Covering an area of saving the system process simple, compact arrangement of equipment, coal and slag does not fall to the ground, no yard, save land;
  • 5.Safety and reliability of pulverized coal in pulverized coal tower before furnace sealed storage, to prevent dust and rain; the high reliability program ignition controller, deflagration furnace ignition and burn complete interlock protection; the electrostatic grounding and CO2 protection device, prevent coal spontaneous combustion of pulverized coal tower; these measures are effective to ensure the storage and combustion of pulverized coal safety;

The classic case

One case: Yunnan Dali Food Co., Ltd. steam supply project

Yunnan Dali food limited company belongs to the modern large-scale food enterprises -- Fujian Dali group. The group set food research and development, production, sales as one, under the jurisdiction of the 16 subsidiaries, is the "national excellent food industry leading enterprises of food", the Chinese famous brand. Our company adopts BOT mode and cooperation, using a 20t/h model of efficient pulverized coal fired boiler for the company to provide continuous, stable and steam heat supply.

Project basic information

  • Purpose: the production of steam;
  • Saturated steam pressure: 1.20Mpa;
  • Steam temperature: 187 ° C
  • Year: 90000 tons of steam heat;

The project of pollutants emission data:

  • Dust concentration: 27.9mg/m3;
  • SO2:62.8mg/m3;
  • NOx:129mg/m3;
  • Ringelmann Blackness: 1
  • Effect: pollutant discharge index lower than the national standard, can meet the emission requirements;

Case two: Taiyuan bodied City district heating boiler room construction project in Shanxi Province

Decimating the city district in Taiyuan city is high-grade commercial district, is by far the largest bodied estate in the development of our country project. The district planning and construction land area of 1584 mu, total construction area of 2400000 m2, the heating area of about 600000 m2. Bodied estate uses a new type of efficient pulverized coal fired industrial boiler system produced by our company, to provide heating service for project phase 20 buildings are more than 4000 households at the same time, to create a high-quality living environment for residents.

Project basic information

  • Application Architecture: in line with national standards for energy conservation
  • Boiler room size: 1*14MW+1*29MW;
  • Heating area: 587000 m2;
  • Purpose: domestic heating;
  • Coal consumption (ton: 8336 tons / heating season;
  • The average coal consumption: 14.2kg/m2;
  • The thermal efficiency of the boiler: 89.26%;

The project of pollutants emission data:

  • Dust concentration: 28.8mg/m3;
  • SO2:31.0mg/m3;
  • NOx:112mg/m3;
  • Ringelmann Blackness: 1
  • Effect: pollutant discharge index lower than the national standard, can meet the emission requirements;

Case three: Xinjiang Urumqi Wulabo heating station

Urumqi Tianshan District Project Construction Committee of the Wulapo water resources relocation project started in 2011, using 2 7MW pulverized coal fired industrial boiler, supporting the cloth bag dust remover and semi dry desulfurization of flue gas treatment system, heating area of 120000 square meters. The system has stable operation, high thermal efficiency, high efficiency of flue gas treatment.

Project basic information

  • Application Architecture: in line with national standards for energy conservation
  • Boiler room size: 2*7MW;
  • Heating area: 120000 m2;
  • Purpose: domestic heating;
  • Coal consumption (ton):3700 tons / heating season;
  • The average coal consumption: 30.8kg/m2;

The project of pollutants emission data:

  • Dust concentration: 9.10mg/m3;
  • SO2:3.0mg/m3;
  • NOx:402mg/m3;
  • Ringelmann Blackness: 1
  • Effect: pollutant discharge index lower than the national standard, can meet the emission requirements;

Case four: Hui County Bureau of housing and Urban-Rural Development

Hui County located in the southeast of Gansu Province, is located in the Qin Ba mountain. In 2013, with the permission of the people's Government of Gansu Hui County, Hui County Housing and urban and Rural Construction Bureau and Shanxi Lantian Environmental Protection Equipment Co. Ltd. Hui County urban central heating project cooperation. The project includes the Hui County District centralized heat source plant heating project construction (including boiler, pulverized coal fired industrial boiler system and facilities), the heat source plant to each thermal power station of a heating pipes and heating station construction, construction period is from April 1, 2013 to November 15, 2013, the project is under construction.

Project basic information

  • Application Architecture: in line with national standards for energy conservation
  • Boiler room size: 2*29MW;
  • Heating area: 700000 m2;
  • Use: central heating;